        Installation Process

        Home > Products > Installation Process
        • Setting the line and carrying the board in positionEject double lines of board thickness up and down the axes of installed wall board, easily carry the panel to the side of wall according to the required specification.
        • Sawing boardUsing hand-hold electric saw to saw freely according to the specification of wall.
        • SizingSpread polymer mortar on one tenon side casually.
        • InstallationCarrying the panel to the installation place, correcting the wall board by gavelock and making it tightly close, and let the polymer mortar squeeze out into full and fixing it with a chock temporarily.
        • Correcting、FixingUsing a guiding rule of two meters or longer to check verticality and leveling correction, then using 6mm or 8mm reinforcing steel bar and using the construction sealant to fix.
        • Grouting and filling starchFilling and strickling the corrected wall panel with polymer mortar, filling the big gap with pea gravel concrete.
        • Stick anticrack tapeClean dirt of each cement gap and stick anticrack tape.
        • Installing electrical wires and switchesSetting lines on the places needing to be set with concealed wire and switch box, then cut a groove by hand-hold electric saw,filling with polymer mortar after installation。
        • Installing doorcasePreparing a door and window hole on the installed wall, anchoring by the splint or lines.
        • Facing coating and wall papersScraping putty powder directly without plastering on the installed wall,then brushing coating and sticking wall paper.
        • Facing cermic tile,decorative sheetSticking ceramic tiles or other wood facing panels casually without plastering on installed wall.
        • Eelectric apparatus installationInstall lights,furniture,air-conditioners casually on installed room, nailed or hanged.